• Barnett FC pitch and West Stand
  • Barnett FC West Stand BAR Area
  • Barnett FC West stand

In the summer of 2013 Barnet Football Club moved from their historic home, Underhill Stadium to The Hive, Edgware.

CGS Electrical Services were appointed to carry out the electrical installation of various pitch side facilitates, such as the new West Stand, which has a capacity of 2600+. The west stand houses various bars, hospitality areas, offices, toilets and security areas within its construction. Against a tight deadline and ever changing design we managed the electrical installation before the first game of the season! Without our reliable contractors, the job would have been just that bit tougher!

Electrical Installation included:

  • New LV distibution from mains incoming supply.
  • New / alterations to exisitng LV Panel boards.
  • Ducted sub main installation.
  • New small power throughout the West Stand.
  • New lighting throughout the West Stand.
  • New electrical installation to the turnstile buildings.
  • Electrical installation to the police / CCTV surveillance area.
  • Electrical modifications to existing changing rooms.

We would like to wish Barnet FC, and all who work there the best of luck in the coming seasons!