• Stadium:MK Double tree
  • Hilton Double Tree - Stadium:MK Bedroom
  • Hilton Double Tree - Stadium:MK Bathroom
  • Hilton Double Tree - Stadium:MK

Hilton Double tree at Stadium:MK, Milton Keynes have been rapid expanding over the last few years. A scheme of 176 new hotel rooms, to add to the existing 120+ were announced to built within undeveloped areas of the stadium.

CGS Electrical Services were appointed to carry out the electrical installation of the 1st phase of the hotel rooms. Coordinating designs with the Main contractor, and direct with Hilton, CGS were able to carry out the installation against challenging time scales, with minimal disruption to the ongoing operation to Hilton Doubletree.

Works included:

  • Design
  • New power and lighting installation
  • Containment installation
  • Testing and certification